OAO "Sibneftgaz" represents project of engine fuel obtaining set building

Building of engine fuel obtaining set (EFOS) near Urengoy settlement area depend on neighboring populated points (New Urengoy town, Korochayevo settlement, Urengoy settlement) need in diesel fuel and high-actin petrol. It necessary to note, that region needs in such kind of fuel would increase with developing of area between Pura and Taza rivers deposits (Polar GOCD, Beregovoe GCD, South-Ural GD and etc.).

Diesel fuel and petrol delivery is unsteady today on account of high railway traffic and in spite of nearness of railway and settlement Korotchaevo railway station.

EFOS ground setting is defined with consideration that settlement Urengoy is situated in the center of drawing consumer circle and it is connected with Noviy Urengoy town and area between Pura and Taza deposits by roads. Condensate of nearby Beregovoe deposit is taken as raw materials for EFOS. Condensate treatment in ground border is in OAO "Sibneftgaz" authority.

Engine fuel obtaining set from gas condensate project include:

  • development of gas wells bushes;
  • development of gas complex preparing set (GCPS) with low temperature separation block and deethanisation of condensate.
  • Treatment deethanisating condensate set with warehouse and filling equipment.

Productivity of EFOS by raw materials -100 th.t/year + 20% - 40%.

Requirement products:
1. Petrol AI -93 or AI-80;
2. Diesel fuel D3;
3. Component of boiler fuel.

Material balance of set:

Version of petrol AI-93 obtaining:

Version of petrol AI-80 obtaining:

Quality of obtained products:

  • high octane petrol, SS 2084-77, with 60%wt. aromatic compound contains, including benzol neither more than 5%wt. or petrol AI-80 with aromatic compound contains to 40%wt., including benzol neither more than 2,3%wt.
  • winter diesel fuel D3, SS 305-82, with freeze temperature not high than 450C; capacity of arctic fuel obtain will be defined after precisely components and fraction contains of first condensate and it's samples research;
  • dry freezing gas, appropriate to GS 51.40-93 requirements, with lowest heating capacity 12000 kcal/kg, molecular weight 14, hydrogen contains to 12%wt pressure 1,8 MPa.

EFOS building is provided on two along grounds:

  • gas complex preparing set - GCPS;
  • deethaning condensate treatment set - DCTS.

EFOS building is length is defined by calculation technique of functional depend on build-assembly works of oil industry and it is 14 month.

Realization of this project require 50 mln$ investment.

Giving financial analysis of project is defined following effective indices:

  • NPV at discount rate 10% - 28,34 mln.$
  • IRR - 21,3 %
  • Profit index - 1,62
  • Discounting recoupment deadline - 6,8 years.

Thus, all project rating, indices testify to financial efficiency and steady. In addition, EFOS building would be aid development of infrastructure and increasing of socioeconomic situation in region.

You may send your request after filling this simple form and pushing "Submit" button. Please, be sure all mandatory spaces are filled.

Your E-Mail:(mandatory):

Your name: (mandatory):

Phone number: (mandatory):

Your message:

You may also contact us by phone (7-095) 923-5274 and by fax (7-095) 925-3364 or by any available way.

webmaster